The thermal growth formula
A pipe grows when it heats and shrinks when it cools. The change in length is:
ΔL = change in length (in) · α = coefficient of thermal expansion (in/in/°F) · L = pipe length between anchors (in) · ΔT = temperature change (°F)
Use the full temperature range the pipe will see: from the lowest temperature (often the installation temperature or a winter shutdown) to the highest operating or upset temperature.
Thermal expansion per 100 ft of pipe
| Temperature | Carbon steel | 304 stainless | Copper |
|---|---|---|---|
| 100°F | 0.76 in | 1.12 in | 1.13 in |
| 200°F | 1.52 in | 2.24 in | 2.30 in |
| 300°F | 2.35 in | 3.40 in | 3.46 in |
| 400°F | 3.23 in | 4.59 in | 4.87 in |
Total expansion per 100 ft measured from 0°F, per Engineers Edge. To estimate growth between two temperatures, subtract the lower row from the higher (interpolate as needed). Stainless and copper grow roughly 40–50% more than carbon steel.
Worked example
100 ft of carbon steel pipe, installed at 70°F, operating at 250°F:
- L = 100 ft × 12 = 1,200 in
- ΔT = 250 − 70 = 180°F
- ΔL = 0.0000065 × 1,200 × 180 ≈ 1.40 in
The same run in 304 stainless would grow about 2.07 in, and in copper about 2.01 in. The loop between those anchors must absorb that axial movement.
Add other movement
- Seismic movement from the engineer of record, usually stated as ± in each axis.
- Building settlement and building expansion-joint movement across structural joints.
- Equipment movement, such as tank settlement or nozzle growth.
State each movement by direction (X, Y, Z) and whether it is total or ±. A flexible U-loop can take movement in all three directions at once.
Anchors and placement
A loop absorbs the growth of the pipe between two anchors. It can sit anywhere in that run as long as the 180° return is free to move. Guides keep the pipe moving along its axis toward the loop. Flexible loops develop no pressure thrust, so anchors mainly resist friction and the force to flex the loop. Your piping engineer sets anchor locations, loads and guides.
Sizing checklist
- Pipe size, schedule and material
- Fluid conveyed
- Operating, design and test pressure
- Min and max temperature
- Run length between anchors
- Movement in X, Y and Z (total or ±)
- End type and pressure class
- Orientation (horizontal, vertical, riser)
- Available L / W / H
- Piping code and listings
Final dimensions, ratings and movement capacity are confirmed during our application review. See also how to specify a metal hose assembly.
From the Technical Reference
Tools for this job
Free tools you can use now, then email the result to Patriot FTS for a quote.
Ratings and dimensions are confirmed by Patriot FTS at quote.